Geo heat pump upgrade is a nightmare

My geothermal heat pump upgrade has been a nightmare, and i first had to get rid of my outdated Heating, Ventilation and A/C unit, and the Heating, Ventilation and A/C supplier had to rip out the existing device as well as remove the HVAC ducts.

I told them to get rid of the HVAC duct as well as I would patch anything they left behind. I should have researched on how they remove HVAC ducts. I thought my cabin was going to fall down. The walls as well as ceiling were totally shot. I had to re-drywall, mud as well as paint again. The scrub up was a mess as well as my cabin still feels dirty, and next, the actual heat pump install is going terrible. The indoor air handler for the proposal was simple, then just an minute of work as well as it is non invasive in the home. The real pain is the outdoor air compressor. The Heating, Ventilation and A/C professional needed to bury the proposal underground so it can work geothermally. The supplier I hired is not capable of doing the digging. I had to hire out another maintenance to create a large hole in my ground that the vertical loop proposal for the heat pump can go in; Coordinating with the digging supplier as well as Heating, Ventilation and A/C girl was a pain. I had to get it dug, the heat pump installed as well as the dirt put back over top! You would swear I was coordinating a complicated dance routine. It took forever as well as cost so much money. The process is still on going as well as I am still without Heating, Ventilation and A/C. I am getting to the point that I don’t even want my geothermal heat pump proposal anymore.

 

Heat pump